Products - Spee-Dee™ Build Up - Clinical Procedure

 

Post Cementation and Core Build Up

Spee-Dee Fig_1&2
Fig. 1: After endodontic treatment, a molar was prepared with two post holes
Fig. 2: Pulpdent Etch-Rite was applied to the post holes and the preparation for 15 seconds. Etching is optional

 

 Spee_Dee Fig_3&4
Fig. 3: After rinsing thoroughly, removing excess moisture and leaving the tooth slightly mopist.
Spee-Dee Build-Up was dispensed into the post holes and around the preparation

Fig. 4: The posts were inserted with a twisting, up and down motion to ensure uniform coverage of
Spee-Dee Build-Up, and then light cured for 20 seconds

 

 Spee_Dee Fig_5&6
Fig. 5: Spee-Dee Build-Up was applied around the posts to the occlusal level

Fig. 6: The post and core preparatin was trimmed and finished and ready for an impression or digital scan